Water Main Installation

Brief:

Sacx was commissioned to install a new 32mm water supply from the existing main line to service a canteen area in a building that previously had no water – crucial for providing staff with much-needed tea breaks!

What We Did:

The Sacx team conducted a Ground Penetrating Radar (GPR) survey to identify any known hazards. Using this information, we planned the shortest and most convenient route to the rear of the building, ensuring minimal disruption to services and walkways.

One of our civils team then began excavation work, allowing the installation of the new water pipe. At the same time, we installed isolation valves at both ends of the system to facilitate future maintenance. The pipe was laid in a sand bed with 100mm of cover, then backfilled with warning tape and compacted according to the design. Finally, the area was reinstated with topsoil and grass seed.

Challenges Overcome:

During the project, we encountered pre-existing pipe structures and damage to the mains pipe. After assessing the situation with the client, we agreed to adjust the location of the new water connection. This solution ensured the building could remain operational throughout the works.

Outcome:

The canteen area was successfully upgraded with new water facilities.

Client:

MOD / Vivo Defence Services

Sector:

Commercial, MOD

Divisons:

Civil Engineering, Water Utilities

Location:

RAF Wittering

Project:

Supply New Water Main

Value:

£15k

Timescale:

1 Week