Brief:
To design and install parking spaces for Building 409.
What We Did:
After reviewing several layout options to meet the site’s requirements, we finalized a plan to install 32 standard car parking bays along with a dedicated area for motorcycle parking. We began the process by importing Type 1 stone to raise the base level and installed two new catch pits for drainage. These were connected to the existing storm drains via separation tanks.
With kerb edgings in place, we brought in additional stone and compacted the sub-base to prepare for the tarmac installation. The tarmac was machine-laid, after which our team swiftly began line marking and organizing the parking layout. Upon completion, we finalized the external landscaping around the car park to enhance the overall area.
Challenges Overcome:
To ensure the parking fit within the designated boundary, we constructed a retaining wall, with a handrail installed above for safety.
Outcome:
The newly constructed car park provided additional parking spaces, freeing up areas previously occupied by gym users and creating more convenience for building residents.