Brief:

Sacx were contracted by Standby Power Solutions to assist with the enabling works and electrical connections for the installation of multiple backup generator sets across numerous care homes for SOHA housing.

Our works included the installation of ducting, pad foundations, cable tray and sub mains. We completed all final connections into existing plant rooms and installation of Automatic transfer switches.

Due to the location of some of the generators some sites required the installation of acoustic fencing to minimise the noise impact on local residents.

Client:

Standby Power Solutions / SOHA Housing

Sector:

Social Housing & Care Homes

Divisons:

Civil Engineering, Electrical

Location:

Multiple

Project:

Enabling works and installation of Generators

Value:

£50k

Timescale:

3 Weeks