Backup Power
Brief:
Sacx were contracted by Standby Power Solutions to assist with the enabling works and electrical connections for the installation of multiple backup generator sets across numerous care homes for SOHA housing.
Our works included the installation of ducting, pad foundations, cable tray and sub mains. We completed all final connections into existing plant rooms and installation of Automatic transfer switches.
Due to the location of some of the generators some sites required the installation of acoustic fencing to minimise the noise impact on local residents.
Client:
Standby Power Solutions / SOHA Housing
Sector:
Social Housing & Care Homes
Divisons:
Civil Engineering, Electrical
Location:
Multiple
Project:
Enabling works and installation of Generators
Value:
£50k
Timescale:
3 Weeks